Home/News
News & insight

Fiber Optic Cable Water Penetration Test Reports
Read a fiber optic cable water penetration report. Check the test method, specimen, exposure conditions and leakage result before approval.

OPGW Downlead and Splice Closure Checklist
Match OPGW downlead clamps, closure entries, splice trays and slack storage to the approved cable and tower drawings before ordering.

FBA Names Winners of First OpTIC Path Regional Rodeo
FBA announced the winners of its first OpTIC Path Regional Rodeo. See what the fiber installation and splicing event highlights…

A splice reads −0.12 dB one way. Should the crew reopen it?
Learn why an OTDR can show negative splice loss, how to match traces from both ends, and what to record…

One central tube or multi tubes? Reading a GYXTW and GYTS drawing
Compare GYXTW and GYTS by loose-tube layout, fiber access, and duct installation. See what to check on the drawing before…

Three new Ebocom guides answer different cable selection questions
Explore three Ebocom guides on outdoor cable construction, G.652.D and G.657 fiber grades, and ADSS jacket and sheath selection.

FBA Highlights Multicore Fiber for Crowded Ducts
A November 12 FBA paper explores multicore fiber for space-limited routes. See how several cores in one strand differ from…

Fiber Optic Loss Budget for a 4 km Link
Work through a 4 km fiber link at 1310 nm. Count mated connections and splices, then compare the loss allowance…

Loose Tube vs Tight Buffer at the Patch Panel
Compare loose-tube and tight-buffered fiber at the patch panel. Use two Ebocom cable drawings to check buffer size, cable entry…

Fibre Horizons 2027 Puts Data Centres on the Agenda
Fibre Council Europe expands its FTTH event to cover data centre connectivity. See what the organiser has confirmed and where…
